For the team
How to use ECO Report
What each part of the app is for, who may do what, and a junior consultant's working day from the morning check to a site visit and back.
Each project has documents (EA, EMPr, licences, permits), and each document has requirements. Every requirement carries a status backed by an evidence reference. What was decided goes in the decision log, what still needs doing is an action, and recurring duties are obligations. Juniors record; seniors review and sign off. The assistant reads it all, cites its evidence, and changes nothing without your confirmation.
The ideas
Organisation and roles
Your firm is an organisation. Everyone in it sees the firm's projects and nobody else does. Each person has a role:
| Role | Can |
|---|---|
| principal | Everything, including adding or changing other principals, connecting the firm's Google Drive, and editing the firm's name and EAP details. |
| senior_production | Everything except the principal-only items. Sets a project's phase, approves or returns juniors' status changes, retires superseded document versions, adds and manages members. |
| junior_consultant | Records the work: statuses, evidence, field observations, decisions, actions, documents, requirements. Status changes wait for a senior's review. |
Projects and phases
A project is one client site or development, identified by a code such as RHH-2026-01. Its phase (pre-construction, construction, operation, rehabilitation) decides which requirements currently count: an operational-phase EMPr commitment isn't outstanding during construction. A principal or senior sets the phase.
Documents
The documents a project must comply with: an EA from DFFE or DEA&DP, the EMPr, a WUL or General Authorisation, a WML, and heritage, biodiversity, municipal or other permits. A document can be replaced by a new version (EMPr Rev 1 to Rev 2). The new version's requirements start Unconfirmed; statuses can be carried over where the wording hasn't changed, and a senior then retires the old version. Its requirements are archived, never deleted.
Requirements and their status
Every obligation in a document is a requirement: an EA condition (3.1 The holder must undertake a botanical search and rescue…) or an EMPr commitment (8.3.2 Topsoil shall be stripped and stockpiled…, with its phase, responsible party and frequency). They're usually extracted from the PDF and checked word for word against it. Requirements from different documents can be linked: EMPr 8.3.2 implements EA condition 12.
| Status | Means |
|---|---|
| Compliant | Being met, and there's evidence to show it. |
| At Risk | Being met for now, but something could tip it, such as a bund starting to crack. |
| Non-Compliant | Not being met. |
| Unconfirmed | Not yet checked. Every new requirement starts here. |
| Not Applicable | Doesn't apply to this project. Say why in the evidence. |
Evidence reference
A status is only as good as its evidence. Every status change records where the proof is: Site audit 2026-09-12, photos 14–17, Waste manifest WM-0233. The app and its assistant never state a status without citing it.
Pending review
When a junior changes a status, it's saved but flagged pending review until a principal or senior approves it, or returns it with a note (it then goes back to what it was). Every change, review and note is in the requirement's history: who, when, from what, to what.
Compliance rate
Compliant ÷ the requirements that apply now: current phase, not archived, not Not Applicable. Unconfirmed requirements count against it, so an unchecked project looks worse than it may be. Checking them is the quickest way to an honest rate.
Decisions and actions
The two are easy to mix up. One records what's settled; the other tracks what's still open.
Decision
A choice already made, recorded so anyone can later see why things are the way they are. It doesn't need doing.
- Date
- when it was made
- Decision
- what was decided
- Reason
- why
- Evidence
- where it's recorded
- Responsible
- who made or approved it
An instruction to the contractor, an authority's ruling, a change of method, an agreed deviation.
Action
Something that still needs doing, with an owner, an optional due date, and a status: Open, In Progress, Closed or Overdue. Close it with evidence of what was done.
- Description
- what must be done
- Owner
- who does it
- Due
- by when
- Status
- where it stands
Repair the bund at the fuel store. Submit the Q3 SAWIS return.
Rule of thumb: “We agreed to move the stockpile” is a decision. “Move the stockpile by Friday” is an action. Often one leads to the other: log the decision, then add the action that carries it out.
Obligations, field work and the map
Obligations
Recurring duties, from three sources: the waste profile (SAWIS and IPWIS, WML reporting, waste records), the project's own requirements that recur (Track recurring requirements: "Monthly", "Quarterly"; daily or weekly ones are tracked monthly), and the legal register. Each has compliance periods (Q4 2026) with a status, evidence, and a responsible person (a member or a project contact) who is reminded before it's due.
Each obligation says what evidence proves a period was met. A period can only be marked Compliant once every evidence item is filled in; a principal or senior can mark it compliant without them by giving a reason, which is recorded. A junior's change to a period is pending review, and every change is in the period's history.
Field observations
What you see on site, captured in one go from a phone: a requirement, its status, a note, a photo, video or voice note, and your GPS position. It updates the requirement and saves the media to the project's Drive folder. With no signal it waits on the phone and sends itself when you're back online.
Map and SSV report
The site boundary and requirements with a location, coloured by status, over government reference layers: critical biodiversity areas, protected areas, watercourses. From here you can download a QGIS project, or build the SSV report (Site Sensitivity Verification), whose AI-drafted mitigation measures the EAP must review before issue.
Documents tab
The project's folder in the firm's Google Drive: authorisations, reports, photos, chat transcripts. Upload here, and extract requirements from an EA, licence, permit or EMPr PDF.
Legal register
Answer the project's facts (what it does, and where it is), then Assess against the library: each Act, regulation or by-law is marked applies, possibly applies, needs review or doesn't apply, with the reason. A provincial or municipal instrument only applies where the project is. Generate obligations from the register adds the applicable obligation sections to the Obligations tab.
The library is shared by every firm and kept by the platform's admins; its entries are drafts until checked against the gazetted text. When a section is amended or repealed, obligations tracking it appear under Changes in the law, and a principal or senior follows the new version (periods and evidence stay) or keeps it.
Messages and overnight
Telegram
On the Messages tab, Link Telegram to get reminders and send things from site. A principal or senior adds project contacts (a contractor's site manager, the client's SHE officer) and sends them an invite link; they don't need an app login. Photos, voice notes, documents and messages sent to the bot land in the project's inbox (media saved to Drive), where you file each as evidence for a period or dismiss it. Reply to a reminder and the evidence arrives already matched to its period. Nothing sent from Telegram changes a status by itself.
Overnight
Each night the app drafts a nightly sweep for every project (top of the Obligations tab): overdue, due in the next two weeks, compliant without evidence, waiting for review, or affected by a change in the law. It changes nothing. It also makes reminders: once when a period comes due and weekly while it's overdue, sent automatically or drafted for a principal or senior, as the organisation's principal sets on the Members tab.
The assistant
A Claude assistant that works on the open project only. It reads everything in the project (requirements, decisions, actions, Drive files) and answers questions about it, always citing evidence.
It can also propose changes: a status update, a new decision, action, requirement or document, or a saved file. Nothing changes until you press Confirm on the card it shows you. Suggested next steps appear as buttons under its reply.
It's a drafting and checking aid, not a professional opinion. Compliance positions and drafted documents need a principal's or senior's review before anything goes to a client or authority.
In practice
A day with the app: Carl
Carl is a junior consultant. He does most of the site work: ECO inspections, evidence gathering and keeping the records current. Robert (principal) and Kirstin (senior) review his status changes and sign off anything that leaves the firm. The site names, emails and references below are examples.
| Carl can | Waits for Robert or Kirstin |
|---|---|
| Update a requirement's status, with evidence | Every status Carl changes is pending review until a senior approves or returns it |
| Log field observations from site, even offline | Setting the project's phase |
| Add decisions, actions, documents and requirements | Retiring an old document version |
| Upload files and extract requirements from PDFs | Adding or changing members (Carl has no Members tab) |
| Ask the assistant, and confirm the changes it proposes | Drafted documents are marked as needing senior review |
-
Morning
What needs attention
- Open app.ecoreport.co.za and sign in with Google. The dashboard shows the firm's projects with their compliance rates, open actions and the latest decisions.
- A project card with a red edge has a low rate. Click it to open the workspace.
- Overview shows the status chart and the rate per document, such as the EA at 33% and the EMPr at 100%.
- Actions: anything Overdue, or due this week, that Carl owns.
- Or ask the assistant: What's outstanding on this project, and what's overdue?
-
On site
A field observation
At the Rock Haven site, the fuel-store bund has cracked (EA condition 4.2, stormwater).
- On his phone, open the project and tap Log observation.
- Choose condition 4.2, status At Risk, and note Hairline crack along the north wall of the fuel-store bund; no spill.
- Take a photo in the form. The GPS position is attached.
- Save observation. With no signal it waits and sends itself later.
The bund needs fixing, so Carl also adds an action (Actions → + Add action): Contractor to repair the fuel-store bund, north wall, owner the contractor's site agent, due in 7 days.
-
Office
Updating statuses
- In Requirements, filter by document, phase or category, such as EMPr · Construction · Waste.
- Click Update, choose the status and fill in the evidence reference: Waste manifest WM-0233, 2026-09-18. Be specific enough for someone else to find it.
- Save. It's pending review.
Kirstin approves or returns it. A returned change comes with her note, and the status goes back to what it was; Carl fixes the evidence and tries again.
-
An email
A decision, then its action
The DEA&DP case officer agrees that the topsoil stockpile may move 20 m east, out of the watercourse buffer. In Decisions → + Log a decision:
- Date
- 2026-09-10
- Decision
- Topsoil stockpile relocated 20 m east of the watercourse
- Reason
- Original position within the 32 m buffer (EA condition 4.2)
- Evidence
- Email from DEA&DP case officer, 2026-09-10
- Responsible
- Kirstin (approved), case officer (agreed)
Then an action carries it out: Contractor to move stockpile by 2026-09-17, closed with a site photo once done.
-
New document
EMPr Rev 2 arrives
- Documents: upload the PDF and extract its requirements as an EMPr. The app reads its tables row by row and checks each against the PDF.
- When adding it (+ Add authorisation or EMPr), tick Replaces an earlier version and pick Rev 1. Its requirements start Unconfirmed; where the wording hasn't changed, Carry over statuses requirement by requirement.
- Kirstin clicks Retire previous version when she's satisfied.
-
Each quarter
Waste obligations
On Obligations, Carl fills in the waste profile, clicks Save waste profile, then Generate obligations from profile. Each quarter he marks the period (SAWIS return, Q4 2026) as pending evidence, then compliant with the submission reference.
-
Any time
Using the assistant well
- Ask: Which EMPr construction commitments have no evidence? Which reference layers does the site intersect?
- Propose: Mark 3.1 compliant, evidence: search and rescue report 2026-08-30. A card shows the exact change; nothing happens until Carl confirms, and it's still pending review.
- Draft: Draft the monthly ECO report summary. The draft is marked for senior review.
Check what it cites. If it says there's no evidence for something, that's the gap to fill on site.
Good habits
- Evidence every statusSpecific enough for someone else to find it.
- Decision or actionLog what was decided and why; add an action for what still needs doing, by whom and by when.
- Unconfirmed isn't compliantUnchecked requirements count against the rate. Working through them is progress.
- Explain Not ApplicableSay why, in the evidence field.
- Sign-off before issueNothing the app or assistant produces goes to a client or authority without a principal's or senior's sign-off.